Subnet 108 — 2026-W41
What changed for subnet 108 during 2026-W41 (5–11 October 2026), with every claim linked to the item behind it.
5–11 October 2026
Subnet 108 recorded four hyperparameter changes between 5 October and 6 October.
Generated from 4 sources
Every sentence above is derived by counting and dating these items. Nothing else went into this page.
- Subnet 108: Maximum burn 1 → 100 — 6 October 2026
- Subnet 108: Minimum burn 0.5 → 0.05 — 5 October 2026
- Subnet 108: Maximum burn 100 → 1 — 5 October 2026
- Subnet 108: Subnet active disabled → enabled — 5 October 2026